home

euroteam@gemission.com
tel: +49 (0)7631 179 956 0
fax: +49 (0)7631 179 956 50

 
     
 

Ongoing
Construction Report


Barn Project,
Kandern, Germany


16 Sept. 2007



Barn as of 26 November 2006

Barn as of Sept. 9, 2007
 

We are now on a major structural phase of the Barn Project. We are pouring foundations and floors, building load-bearing walls and removing the last of the inner walls and flooring. The following photos are from 16 September.


More Wood Removed on the Right Side of Building


Inside Walls going up and Elevator Shaft Base

A bit of a difference from last weeks photos with the skeletal remains of the flooring and the safety netting gone. We will not have an elevator initially because of costs, but are required by German law to have the space for one. You can compare photos from last week by viewing last week HERE.


Inside Load-Bearing Walls and Cellar Entrance - Yard Full of Building Materials


Inside View (L) and eDot Office Area, Apartment and Tool Room Cellar Entry(R)


A View Through the Rafters --- Elevator Shaft Base Next to Load-Bearing Wall

Be sure to look at our Team and Individual Opportunities pages or e-mail us for more details. You can also open up the Barn Project PDF to see what type of work is needed. Hope to see you soon!