First off, I had the apartments numbered wrong... They are the opposite, so 1 is 4 and 4 is 1...
Tiling, painting, building, plastering continue...
The following photos are from 25 September 2008


L-R: Kim Tiling Apt. 4 Bath/ Craig Building Base Around Shower in Apt 4
The following photos are from 26 September 2008


L-R- Sara Painting Apt 4 Bedroom/ Apartment 4 Bath

Apt 4 Kitchen & Entry


L&R- Apt 1 Livingroom & Kitchen/ Apartment 1 Livingroom
Jim M. Working on GEMStone Editing Room
The following photos are from 27 & 29 September 2008


L&R- Apt 4 Bedroom (27th)/ Apt 4 Bedroom (29th)

Sara and Kim Finishing Wall Tile in Apt 4 Bath