GEMStone Media Offices are nearing completion and work on hallways and entry continues.
The following photos are from 7 February 2009
L-R- Front of the Building
Parking Area
Nathan, Vic and Dana Working on eDOT Kitchen Area
Rich's Office in eDOT Complete
L-R- Chris' Office Top Floor / Steve's Office Top Floor
L-R- Wall Stabilizers in Steve's Office / Kitchen Area Outside Steve's Office
L-R- Sara Paints Studio Room Walls / GemStone Studio Rooms Top Floor
L-R- GemStone Offices Top Floor
L-R- GEMStone Loft / Loft to Common Area With Jim on Scaffolding
L-R- Jim on Scaffolding in GemStone Common Area / Top Floor Bathroom Entry
L-R- 1st Floor Ladies Room Caulked and Complete
L-R- Front Entry Power Panel Area / Marek Prepares Entry Ceiling for Painting
L-R- Ground to 1st Floor Stairs / 1st Floor Common Area
L-R- 1st Floor Power Panel Area / 1st Floor Common Area
1st to 2nd Floor Stairs
L-R- 2nd Floor Common Area / 2nd Floor Power Panel Area
8 February
A Saturday Set Aside for Grouting
L-R- Kim Grouting 1st Floor Common Area / Stan Grouting 2nd Floor Bathroom Entry Area
10 February
L-R- Entry Tiling / Kim & Stan Working on Ground Floor Stairs Tiling
Stan & Kim Tiling