The structural phase of the Barn Project continues. The tile roof is now being placed and is complete on the back side. The rough openings for windows are being finished by pouring the sills and blocking in the sides.

The following photos are from 21 Feb 2008.



Ground Floor Sills Prep and Poured


L-R- Vic & Freddie Mix / First Floor Window Opening Work


First Floor Window Openings

Roofing Tile Work on 25 Feb


L-R- Freddie & Bob on the Dormer/ Back Side of Roof Complete!

Work on Window Openings 28 Feb


L & R- Vic Blocking In /
Craig Finishing Sill


L & R Ground Floor Sills Poured / Sara Works on Sill Frames